SEHI completion certificate

Shin-etsu Trail Completion Certificate

Shin-etsu Trail is a recognised Long-distance trail in Nagano and Niigata prefectures, running from Mount Madarao to Mount Naeba over approximately 110 km.

Region
Nagano and Niigata prefectures
Country
Japan
Distance
110 km
Typical duration
6-7 days
Difficulty
Strenuous
Digital certificate
From €9.99
Shin-etsu Trail landscape certificate route preview in Japan
230806 Lake Nojiri view from Nojiriko Terrace Shinano Nagano pref Japan01s3230806 Lake Nojiri view from Nojiriko Terrace Shinano Nagano pref Japan01s3 by 663highland, CC BY-SA 4.0; cropped and colour-treated.
SEHIRegistry route
Shin-etsu Trail place-specific certificate preview
Image source and licence
230806 Lake Nojiri view from Nojiriko Terrace Shinano Nagano pref Japan01s3 by 663highland, CC BY-SA 4.0; cropped and colour-treated.
Verification application

Sign in before you start

Authentication protects your application, payment status, and private evidence. You will return to this trail after signing in or creating an account.

Trail context

A certificate grounded in the journey.

A considered completion record for Shin-etsu Trail, built around private evidence review and a permanent public verification layer.

Completed Shin-etsu Trail? Submit route-appropriate GPS tracks, activity links, dated photos, stamps, permits, guide confirmation, club confirmation, or a clear completion narrative. Route variants are assessed from the evidence provided.

Structured trail record

Authority, season and access

Official route status

Officially managed ridge long trail from Madarao to Naeba

Long-distance trail
Normal endpoints

Mount Madarao to Mount Naeba

Catalogue references: 36.837, 138.275 to 36.845, 138.691
Elevation range

600 m to 2,145 m

Rounded catalogue elevations
Recommended months

June-November

Typhoons, snow, volcanic alerts, heavy rain, landslides and trail maintenance can close sections.
Access requirements

Check temple etiquette, park notices, hut reservations, local transport and any mandatory registration.

Permit/booking · Seasonal constraints
Collection and characteristics

Long-distance trail

Japan KoreaHeritageMountainsWaymarked

Coordinates and elevations are rounded catalogue references for discovery only. They are not navigation-grade or emergency waypoints. Always use current official route information and an appropriate map.

Reviewed route data

Route, stages and elevation

Schematic stage sequence for Shin-etsu Trail
Route sequence reconciled against the linked trail-specific sources. Schematic is not for navigation.
Reviewed trail distance
110 km
Cumulative ascent
Approx. 6,500 m
Typical stages
6-7 walking days
StartMount MadaraoFinishMount Naeba
  1. 1Mount Madarao
  2. 2Lake Nozomi
  3. 3Sekida Range
  4. 4Nabekura-yama
  5. 5Amamizu-yama
  6. 6Mori Miyanohara
  7. 7Mount Naeba

Planning summary only. Check current closures, permits, weather, transport, and official navigation sources before travel.

Primary trail sourceSupporting route source 2Supporting route source 3Supporting route source 4Supporting route source 5Supporting route source 6

Why get this certificate?

Shin-etsu Trail is a recognised Long-distance trail in Nagano and Niigata prefectures, running from Mount Madarao to Mount Naeba over approximately 110 km.

Your certificate includes a premium PDF, a permanent QR verification page, registry-signed metadata, and privacy-aware public display settings.

Accepted evidence

Route-matched proof examples

  • Continuous dated GPX, FIT, TCX, or equivalent activity record covering the recognised route
  • Route checkpoints: Mount Madarao; Lake Nozomi; Sekida Range; Nabekura-yama; Amamizu-yama; Mori Miyanohara; Mount Naeba
  • Dated endpoint and checkpoint photographs plus stage history where track coverage has material gaps
  • Evidence of required permits, bookings, guide arrangements, or access compliance where applicable
Before payment

Prepare proof that tells the whole route story.

Best evidence: GPX, FIT, or TCX files, trusted activity links, dated trail photos, stamps, permits, or guide confirmation. Photos alone may need supporting context.

Expected review level: Evidence Reviewed. Most reviews target 2–3 working days after payment and private proof upload.

Trail proof checklist

  • Continuous dated GPX, FIT, TCX, or equivalent activity record covering the recognised route
  • Route checkpoints: Mount Madarao; Lake Nozomi; Sekida Range; Nabekura-yama; Amamizu-yama; Mori Miyanohara; Mount Naeba
  • Dated endpoint and checkpoint photographs plus stage history where track coverage has material gaps
  • Evidence of required permits, bookings, guide arrangements, or access compliance where applicable

Distance and route variants are reviewed conservatively. Public pages never publish raw GPS points or private proof files.

Private review layer

Your proof is not your public profile.

Reviewers may see

GPS and activity files, uploaded photos, permits, stamps, guide confirmations, completion narrative, and clarification replies.

The public may see

Certificate status, trail, privacy-controlled display name, dates, verification level, issue date, fingerprint, and registry signature state.

Privacy for hikers

Supported route variants

Complete the official Sections 1–10. Trailhead access paths and optional summit side trips are excluded; some snow-season use requires different safety controls.

Key route sequence: Mount Madarao - Lake Nozomi - Sekida Range - Nabekura-yama - Amamizu-yama - Mori Miyanohara - Mount Naeba.

Prepare your proof

Verification levels

Evidence ReviewedPrivate completion evidence was assessed by a Verified Hikes reviewer.

GPS Evidence ReviewedA GPS file or trusted activity record formed part of the evidence review.

Photo + GPS ReviewedPhotographic context and GPS or activity evidence both supported the review.

Partner ConfirmedAn approved partner confirmed completion through a defined workflow.

Authority ConfirmedA trail authority explicitly confirmed the record through an approved workflow.

How the process works

Start verification

Create a paid application for this trail.

Upload proof

Add GPS, activity links, photos, stamps, permits, or confirmation documents privately.

Registry review

A reviewer checks evidence, dates, privacy, and verification level.

Certificate issued

Receive your premium PDF and QR-verifiable public record.

FAQ

What does the QR code prove?

It opens a safe registry page showing certificate metadata, signature status, evidence summary, and PDF fingerprint.

Request correction

See outdated trail facts? Send a correction request so the registry team can review the route record before publication changes.

Request correction/update