KFAN completion certificate

Kantō Fureai Trail Completion Certificate

Kantō Fureai Trail is a recognised Trail network in Kantō region, running from Umenoki Daira, Hachiōji to Umenoki Daira, Hachiōji over approximately 1794-1800 km.

Region
Kantō region
Country
Japan
Distance
1794-1800 km, depending on route variant
Typical duration
70-110 days
Difficulty
Strenuous
Digital certificate
From €9.99
Kantō Fureai Trail landscape certificate route preview in Japan
Trail to Gonjiri Pass @ Shirayazawa Creek @ Kanto Fureai Trail @ Hike from Lake Naguri to Ome (14047008142)Trail to Gonjiri Pass @ Shirayazawa Creek @ Kanto Fureai Trail @ Hike from Lake Naguri to Ome (14047008142) by Guilhem Vellut from Annecy, France, CC BY 2.0; cropped and colour-treated.
KFANRegistry route
Kantō Fureai Trail place-specific certificate preview
Image source and licence
Trail to Gonjiri Pass @ Shirayazawa Creek @ Kanto Fureai Trail @ Hike from Lake Naguri to Ome (14047008142) by Guilhem Vellut from Annecy, France, CC BY 2.0; cropped and colour-treated.
Verification application

Sign in before you start

Authentication protects your application, payment status, and private evidence. You will return to this trail after signing in or creating an account.

Trail context

A certificate grounded in the journey.

A considered completion record for Kantō Fureai Trail, built around private evidence review and a permanent public verification layer.

Completed Kantō Fureai Trail? Submit route-appropriate GPS tracks, activity links, dated photos, stamps, permits, guide confirmation, club confirmation, or a clear completion narrative. Route variants are assessed from the evidence provided.

Structured trail record

Authority, season and access

Official route status

Official 160-course Japanese Long-Distance Nature Trail network around Kantō

Trail network
Normal endpoints

Umenoki Daira, Hachiōji to Umenoki Daira, Hachiōji

Catalogue references: 35.614, 139.258 to 35.614, 139.258
Elevation range

0 m to 2,017 m

Rounded catalogue elevations
Recommended months

April-June · September-November

Typhoons, snow, volcanic alerts, heavy rain, landslides and trail maintenance can close sections.
Access requirements

Check temple etiquette, park notices, hut reservations, local transport and any mandatory registration.

Permit/booking · Seasonal constraints
Collection and characteristics

Trail network

Japan KoreaHeritageMountainsWaymarked

Coordinates and elevations are rounded catalogue references for discovery only. They are not navigation-grade or emergency waypoints. Always use current official route information and an appropriate map.

Reviewed route data

Route, stages and elevation

Schematic stage sequence for Kantō Fureai Trail
Route sequence reconciled against the linked trail-specific sources. Schematic is not for navigation.
Reviewed trail distance
1794-1800 km, depending on route variant
Cumulative ascent
Approx. 48,000 m
Typical stages
70-110 walking days
StartUmenoki Daira, HachiōjiFinishUmenoki Daira, Hachiōji
  1. 1Umenoki Daira
  2. 2Mount Takao
  3. 3Okutama
  4. 4Chichibu
  5. 5Mount Myōgi
  6. 6Mount Tsukuba
  7. 7Kasumigaura
  8. 8Kujūkuri
  9. 9Bōsō
  10. 10Miura Peninsula
  11. 11Tanzawa
  12. 12Umenoki Daira

Planning summary only. Check current closures, permits, weather, transport, and official navigation sources before travel.

Primary trail sourceSupporting route source 2Supporting route source 3Supporting route source 4Supporting route source 5

Why get this certificate?

Kantō Fureai Trail is a recognised Trail network in Kantō region, running from Umenoki Daira, Hachiōji to Umenoki Daira, Hachiōji over approximately 1794-1800 km.

Your certificate includes a premium PDF, a permanent QR verification page, registry-signed metadata, and privacy-aware public display settings.

Accepted evidence

Route-matched proof examples

  • Continuous dated GPX, FIT, TCX, or equivalent activity record covering the recognised route
  • Route checkpoints: Umenoki Daira; Okutama; Chichibu; Mount Tsukuba; Kasumigaura; Bōsō; Miura Peninsula; Umenoki Daira
  • Dated endpoint and checkpoint photographs plus stage history where track coverage has material gaps
  • Evidence of required permits, bookings, guide arrangements, or access compliance where applicable
Before payment

Prepare proof that tells the whole route story.

Best evidence: GPX, FIT, or TCX files, trusted activity links, dated trail photos, stamps, permits, or guide confirmation. Photos alone may need supporting context.

Expected review level: Evidence Reviewed. Most reviews target 2–3 working days after payment and private proof upload.

Trail proof checklist

  • Continuous dated GPX, FIT, TCX, or equivalent activity record covering the recognised route
  • Route checkpoints: Umenoki Daira; Okutama; Chichibu; Mount Tsukuba; Kasumigaura; Bōsō; Miura Peninsula; Umenoki Daira
  • Dated endpoint and checkpoint photographs plus stage history where track coverage has material gaps
  • Evidence of required permits, bookings, guide arrangements, or access compliance where applicable

Distance and route variants are reviewed conservatively. Public pages never publish raw GPS points or private proof files.

Private review layer

Your proof is not your public profile.

Reviewers may see

GPS and activity files, uploaded photos, permits, stamps, guide confirmations, completion narrative, and clarification replies.

The public may see

Certificate status, trail, privacy-controlled display name, dates, verification level, issue date, fingerprint, and registry signature state.

Privacy for hikers

Supported route variants

The 160 courses do not always connect directly. Full-network completion requires each official course; public-transport links between non-contiguous courses are permitted only as access, not trail distance.

Key route sequence: Umenoki Daira - Mount Takao - Okutama - Chichibu - Mount Myōgi - Mount Tsukuba - Kasumigaura - Kujūkuri - Bōsō - Miura Peninsula - Tanzawa - Umenoki Daira.

Prepare your proof

Verification levels

Evidence ReviewedPrivate completion evidence was assessed by a Verified Hikes reviewer.

GPS Evidence ReviewedA GPS file or trusted activity record formed part of the evidence review.

Photo + GPS ReviewedPhotographic context and GPS or activity evidence both supported the review.

Partner ConfirmedAn approved partner confirmed completion through a defined workflow.

Authority ConfirmedA trail authority explicitly confirmed the record through an approved workflow.

How the process works

Start verification

Create a paid application for this trail.

Upload proof

Add GPS, activity links, photos, stamps, permits, or confirmation documents privately.

Registry review

A reviewer checks evidence, dates, privacy, and verification level.

Certificate issued

Receive your premium PDF and QR-verifiable public record.

FAQ

What does the QR code prove?

It opens a safe registry page showing certificate metadata, signature status, evidence summary, and PDF fingerprint.

Request correction

See outdated trail facts? Send a correction request so the registry team can review the route record before publication changes.

Request correction/update